Commissioning
The whole line is run from raw water through to permeate; pressure, flow rate and permeate quality are measured. Operating conditions are set from the control panel.
- Starting the stages in sequence
- Pressure and flow adjustments
- Entering the automation parameters
- Handover to the plant operators