Water Treatment and Recovery for the Mining Industry

Solutions that address process water, site water and discharge load together, separating suspended solids and making water reusable with membrane stages.

On mine sites water is used at every step of ore preparation: grinding, washing, classification and flotation draw large volumes of water. In addition, water pumped from the pit, surface runoff from waste rock and stockpile areas, and water returning from the tailings dam are all site water that has to be managed. What these streams have in common is a high suspended solids load; some carry heavy metals or sulphate, or are acidic in character.

That is why recovery sits at the centre of water treatment in mining. Putting used water back into circulation lowers both the intake, which is limited at many sites, and the discharge load. The arrangement is set by the water analysis: suspended solids are separated first, then ultrafiltration and nanofiltration or reverse osmosis stages are added according to the target use. Because site conditions differ greatly, an on-site inspection is as fundamental to the work as the raw water analysis.

Where water is used

The decisive quality

  • Ore preparation and flotation

    At most sites, grinding, washing and flotation water circulates in a loop. The suspended solids load abrades pumps and pipes; calcium, sulphate and dissolved metals that accumulate in the loop can form deposits in the pipework and affect reagent consumption and separation efficiency in flotation.

  • Pit and site water

    Water from pit dewatering and from waste rock and stockpile areas must in most cases be treated before it is discharged or reused. Suspended solids, acidity, heavy metals and sulphate are the decisive parameters of this stream; because its composition varies with the ore and the season, the arrangement is set by analysis.

  • Dust suppression and washing

    Spraying haul roads and stockpiles, dust suppression at crushers and equipment washing can be done with lower-quality water. What is decisive is removing suspended solids to a level that will not clog the nozzles; these lines are often the easiest point of use for recovered water.

  • Camp and site drinking water

    At remote sites, staff drinking and utility water is mostly prepared from a well or from surface water. Microbiological safety and compliance with the Turkish Regulation on Water Intended for Human Consumption are decisive; arsenic, iron and manganese that may be present at the source are assessed separately in the analysis.

Work out your line in a few steps

The solution finder opens with this sector selected; choose your water source and goal and it shows the treatment stages that fit.

Try the solution finder →

Frequently asked questions

How is water recovered on a mine site?

The first step is separating the suspended solids; settling and filtration take out most of this load. Fine particles and colloids are retained by ultrafiltration. If the water will only be used for dust suppression and washing, these stages are often sufficient; if it is going to the process, a boiler or a discharge point with tight limits, nanofiltration or reverse osmosis is added. Concentrate management is planned at the very start.

How is site water containing sulphate and heavy metals treated?

Most heavy metals are precipitated as hydroxides by pH adjustment and separated along with the suspended solids; ultrafiltration retains the fine hydroxides that escape settling. Dissolved sulphate, however, cannot be removed by filtration; nanofiltration or reverse osmosis is required. Because of the risk of calcium sulphate scaling on the membrane surface, the recovery rate and the choice of antiscalant are set together according to the water analysis.

Is temporary water treatment possible at remote mine sites?

It is. During periods such as exploration, site start-up or a maintenance shutdown of the permanent plant, mobile units built in a container or on a skid can be used. As with a permanent system, stage selection is based on the analysis of the water on site; power, raw water and waste connections are planned in advance. Duration, installation and commissioning scope are agreed together at the preliminary discussion.

Send us your raw water analysis and the flow rate you need

Let us size the system together; we will survey the site in person if needed.